Duro-Last Commercial Roofing

35 years as a certified Duro-Last installer. Custom-fabricated PVC systems built to fit your building.

Why Choose Duro-Last for Your Commercial Building?

If you have a flat or low-slope commercial building, the roofing system protecting it matters more than most people realize. Flat roofs do not shed water the way a pitched residential roof does. Water sits on them. It pools around drains, curbs, HVAC units, and pipes. Every seam, every penetration, and every edge is a potential leak point. That is why the roofing system you choose and the contractor who installs it are both decisions worth getting right.

Duro-Last is a PVC single-ply membrane designed specifically for flat and low-slope commercial applications. It is the only single-ply manufacturer that custom-fabricates the entire roofing system to fit your specific building. The deck sheets, accessories, flashings, and details are all manufactured to your building's exact dimensions before they ever arrive on your roof. That is a fundamentally different approach from unrolling generic sheets and welding everything together on site.

How Does Custom Fabrication Change the Installation?

With a standard single-ply system, the installer rolls out large sheets of membrane on your roof, cuts them to fit, and heat-welds every seam and detail on site. The more seams you weld in the field, the more opportunities there are for something to go wrong. Weather, wind, dust, moisture, temperature, human error. Every field-welded seam is a potential leak point.

With Duro-Last, up to 85 percent of the seams are completed in a factory-controlled environment before the material ships to your building. The sections arrive pre-welded, pre-cut, and ready to lay down. Custom-fabricated accessories fit the curbs, pipes, drains, and edges on your specific roof. Our crew welds the remaining seams on site, but the majority of the work that historically causes callbacks has already been done under controlled conditions.

The result is a faster, cleaner installation with less waste, less noise, and less disruption to your business. Your building does not shut down while we work. There is no hot tar, no open flame, and no strong chemical odors. The installation is clean and quiet enough that most tenants barely notice we are up there.

What Does 35 Years as a Certified Installer Mean?

We have been a certified Duro-Last installer since the early 1990s. In January 2026, Duro-Last recognized us with their 35-year certified installer award. That is not something they hand out often. It means we have maintained their certification standards, completed their training requirements, and installed their product to their specifications consistently for more than three decades.

Over 35 years, we have watched other roofing products and systems come and go. Some were cheaper. Some promised faster installs. But the buildings we put Duro-Last on in the 1990s are still performing. We have roofs in Northern Utah that have been up for 20-plus years with no major issues. That track record is why we have never switched to a different product. When something works, you stick with it.

How Does Duro-Last Hold Up in Utah's Climate?

Commercial flat roofs in Northern Utah take a beating. Snow loads sit on them for months. The freeze-thaw cycle works on every seam and penetration. UV exposure at our elevation is more intense than in lower-altitude states, and summer heat on a flat roof can push surface temperatures well above ambient. The membrane has to handle all of that without cracking, splitting, or losing its waterproofing integrity.

Duro-Last's PVC formulation is engineered to resist UV radiation, ponding water, chemicals, and temperature extremes. The 50-mil membrane puts 28 mils of thickness on the top performance layer, which is the layer exposed to the weather. That exceeds industry standards and most competitors at the same or even higher mil values. The woven anti-wicking scrim reinforcement prevents water from traveling through the membrane if it is ever punctured.

For buildings with unique challenges, like restaurant grease exhaust, chemical exposure from manufacturing, or heavy rooftop equipment traffic, PVC is the right material. It resists the acids, alkalis, animal fats, and industrial chemicals that would degrade other single-ply options.

What Warranty Options Does Duro-Last Offer?

Duro-Last offers warranty tiers that go well beyond what most commercial roofing manufacturers provide. The 15-year warranty with consequential damage coverage is available at no additional cost on custom-fabricated systems. That means if a roof failure causes water damage to the inside of your building, the damage to your interior is covered. Most manufacturers do not include that.

For longer protection, Duro-Last offers 25-year and 30-year warranty options with materials, labor, hail, and high-wind coverage. The warranty is backed by Duro-Last directly, and they have a team of over 80 technical representatives across North America who handle warranty inspections and claims. It is not a warranty on paper that disappears when you need it. It is a warranty with real support behind it.

Why Do Building Owners in Davis and Weber County Choose Bob Harvey?

Bob Harvey is a third-generation roofer who learned the trade from his father, who learned it from his father. The company has been family-owned since 1988, and every crew member is a W-2 employee trained by us, insured by us, and accountable to us. We do not use subcontractors. When you hire Bob Harvey Roofing, you get the same crew that has worked together job after job across Davis County, Weber County, and Northern Utah.

We have been doing commercial work in this area for decades. We understand that your building does not shut down for a roof project, and we plan accordingly. Call us at (801) 544-5125 to schedule a free inspection.

We have installed Duro-Last systems on commercial buildings from Layton and Clearfield to Ogden and throughout Davis and Weber Counties. As a CertainTeed ShingleMaster Premier Contractor on the residential side and a certified Duro-Last installer on commercial, we bring the same standards to every project regardless of size.

Completed commercial roof installation in Northern Utah by Bob Harvey Roofing
Quick Facts
35-year certified installer with multiple Duro-Last awards
Up to 30-year warranty with materials, labor, and consequential damage
Custom fabricated to your building's exact dimensions
Free commercial inspections with detailed proposals
★★★★★
"Bob and his team has provided a great product and amazing workmanship on one of my income properties. He provided a great solution to a problem that altered the way the water drained off the roof. I highly recommended Bob Harvey Roofing for both commercial and residential roofing."
Jerron Hale
Google Review

Why Building Owners Choose Duro-Last

The features that make Duro-Last the standard for commercial flat roof systems.

Custom Fabricated

Built to your building's exact measurements. Not cut from generic rolls.

Factory-Welded Seams

Up to 85% of seams done in the factory. Fewer field welds, fewer leak risks.

Energy Efficient

White reflective membrane reduces cooling costs and urban heat island effect.

Consequential Damage

15-year warranty with interior damage coverage at no extra cost.

Handles Ponding Water

PVC membrane stands up to standing water that would degrade other materials.

Chemical Resistant

Resists grease, acids, alkalis, and industrial chemicals on the roof surface.

Recover Option

Lightweight enough to install over existing roofs without full tear-off in many cases.

Recyclable

Duro-Last's Recycle Your Roof program repurposes old PVC membrane into new products.

Common Questions About Duro-Last Commercial Roofing

What building owners and facility managers want to know about Duro-Last.

What is Duro-Last and why is it different from other commercial roofing?

Duro-Last is a PVC single-ply roofing membrane designed for flat and low-slope commercial buildings. What sets it apart is custom fabrication. Duro-Last is the only single-ply manufacturer that custom-fabricates the entire roofing system, including deck sheets and accessories, to fit your specific building. Up to 85 percent of the seams are completed in a factory-controlled environment before the material arrives at your building. That means fewer seams welded on the roof, which means fewer potential leak points.

How long does a Duro-Last roof last?

Duro-Last roofs regularly perform for 20-plus years with proper maintenance, and many last well beyond that. The membrane is engineered to resist UV radiation, chemicals, fire, and ponding water. Warranty options go up to 30 years with materials, labor, and consequential damage coverage. We have Duro-Last roofs on buildings in Northern Utah that we installed decades ago and they are still performing well.

What warranty options does Duro-Last offer?

Duro-Last offers several warranty tiers: Basic, Ultra, and Supreme. The Basic warranty covers the membrane. Ultra adds materials and labor. Supreme is the top tier with materials, labor, and consequential damage coverage, meaning if a roof failure causes damage to the interior of your building, that damage is covered too. Warranty terms go up to 15, 25, or 30 years depending on the tier. The 15-year warranty with consequential damage coverage is available at no additional cost on custom-fabricated Duro-Last systems.

Can Duro-Last be installed over an existing roof?

In many cases, yes. Duro-Last is lightweight enough that it can often be installed directly over an existing roof without a full tear-off, as long as the existing roof deck is structurally sound and the substrate is in acceptable condition. This saves you the cost and disruption of removing the old roof. We evaluate each building individually and let you know whether a recover or a full tear-off makes more sense for your situation.

How much does a Duro-Last commercial roof cost?

Commercial roofing costs vary significantly based on building size, roof condition, insulation requirements, the number of penetrations and curbs, and the warranty tier you choose. Duro-Last is a premium system and it costs more than some alternatives, but the custom fabrication reduces installation time and labor costs, and the long-term performance typically makes it the least expensive option over the life of the building. We provide free inspections and detailed proposals so you can see exactly what your project involves.

Why has Bob Harvey Roofing been with Duro-Last for 35 years?

Because it works. We started installing Duro-Last in the early 1990s and we have never had a reason to switch. The product performs the way they say it will, the warranty support is real, and the custom fabrication process makes our installations cleaner and faster. We have watched other roofing products come and go over three decades. Duro-Last has stayed consistent. That kind of track record matters when you are putting a roof on a building you plan to own for the next 20 or 30 years.

Learn More in Our Knowledge Center

Straight talk about roofing from people who actually do the work.

Time to Take Care of Your Commercial Roof?

We will inspect your building, explain what we find, and give you a clear proposal. No pressure. Just straight answers from a team that has been doing this for 35 years.

Schedule a Free Inspection (801) 544-5125